export of large equipment

63b91579d9b38c90cc12ff65cd482af1_u=2676412597,1062451521&fm=253&fmt=auto&app=138&f=JPEG_w=667&h=500.webp


The 4.2 meter wide 46 ton heavy large backlight assembly machine exported by SPEED to the United States was safely hoisted onto the ship at the Yantian Port dock in Shenzhen, marking that the engineering logistics department of SPEED has once again made impressive achievements in the marine logistics project of exporting large and overweight equipment flat containers to the United States, laid the foundation for special logistics under the extreme situation of international trade logistics under the influence of the "COVID-19" epidemic, and accumulated rich operating experience, Also prepare corresponding plans for future logistics.


What are the procedures and issues to pay attention to when declaring the export of large equipment?


  1. Choose a maritime logistics provider. The seller should clarify the requirements for the carrying vessel, loading date, sailing schedule, loading and unloading requirements, lifting equipment requirements, etc.

  2.  Shipping. After determining the berthing time of the cargo ship, ordinary goods will be gathered at the port in advance, and major items will be arranged for direct pickup by vehicles and ships; At the same time, complete port dredging and customs clearance work in advance; Check the lifting equipment inside the ship before loading and check the condition of the goods before lifting; Notify the insurance company and hire a third-party supervision company to supervise the loading process; After the lifting is completed, check the status and position of the goods, and record the binding situation.

  3.  Unloading. Track the status of the ship at all times, prepare for unloading and lifting equipment in advance, and complete the dredging work; Direct pick-up of goods ensures that vehicles wait in advance within the port; Check the condition of the goods before unloading, and promptly handle any damage; Determine the unloading plan, lifting equipment, and operation time; Ensure that insurance companies participate in the entire unloading process and third-party supervision throughout the unloading process.